国产又色又爽又黄的,97久久综合亚洲色hezyo,色悠久久久久综合先锋影音下载,麻豆国产丝袜白领秘书在线观看

查看全部
當(dāng)前位置:首頁   >    產(chǎn)品中心   >    電壓擊穿試驗(yàn)儀   >    介電擊穿強(qiáng)度試驗(yàn)儀   >   BDJC-50KV高壓介電強(qiáng)度擊穿試驗(yàn)儀 產(chǎn)品展示

高壓介電強(qiáng)度擊穿試驗(yàn)儀

型 號(hào)BDJC-50KV

更新時(shí)間2023-08-08

廠商性質(zhì)生產(chǎn)廠家

報(bào)價(jià)

產(chǎn)品描述:高壓介電強(qiáng)度擊穿試驗(yàn)儀

產(chǎn)品概述

高壓介電強(qiáng)度擊穿試驗(yàn)儀試驗(yàn)方式:直流/交流:擊穿試驗(yàn)、耐壓試驗(yàn)、階梯試驗(yàn)
顯示方式:曲線/數(shù)據(jù)顯示,數(shù)據(jù)打印。
試驗(yàn)空間:絕緣油/空氣
升壓速率:0.1KV/S-3KV/S
整機(jī)精度:≤2%

 

 

高壓介電強(qiáng)度擊穿試驗(yàn)儀性能特點(diǎn):
1、主要由升壓系統(tǒng)、測量系統(tǒng)、A/D轉(zhuǎn)換器、放電系統(tǒng)、電極、油箱、電極定位架、計(jì)算機(jī)數(shù)據(jù)處理系統(tǒng)、軟件等組成;
2、計(jì)算機(jī)---A/D轉(zhuǎn)換器---測量控制系統(tǒng)---調(diào)壓裝置---升壓變壓器---試樣;
3、高壓變壓器主要產(chǎn)生試樣所需的直流電壓;
4、調(diào)壓器用于調(diào)節(jié)升壓變壓器輸入端電壓以產(chǎn)生高壓所需的輸入電壓;
5、電壓測量主要是從高壓變壓器測量端測量,高壓變壓器測量端和高壓端是線性的;
6、放電系統(tǒng)在試驗(yàn)做完以后放電,以免產(chǎn)生放電對人身的危害;(當(dāng)試驗(yàn)結(jié)束后,機(jī)器部件仍可能存在殘留的高電壓,此殘留電壓足以對人產(chǎn)生致命的傷害,配備此棒,完好的解決此安全隱患)。

 

 

組成:
1、升壓部件:由調(diào)壓器和高壓變壓器組成0~50KV的升壓部分。
2、動(dòng)部件:由步進(jìn)電機(jī)均勻調(diào)節(jié)調(diào)壓器使加給高壓變壓器的電壓變化。
3、檢測部件:由集成電路組成的測量電路。通過信號(hào)線把檢測的模擬信號(hào)和開關(guān)信號(hào)傳給計(jì)算機(jī)。
4、計(jì)算機(jī)軟件:通過智能電路把由檢測設(shè)備采集的測控信號(hào)傳給計(jì)算機(jī)。計(jì)算機(jī)根據(jù)采集的信息控制設(shè)備運(yùn)行并處理試驗(yàn)結(jié)果。
5、試驗(yàn)電極:根據(jù)國家標(biāo)準(zhǔn)(1408.1-2006)隨設(shè)備提供三個(gè)電極,具體規(guī)格為:Ф25mm×25mm兩個(gè);Ф75mm×25mm一個(gè)。(訂做除外)

 

 

性能特點(diǎn):
1、主要由升壓系統(tǒng)、測量系統(tǒng)、A/D轉(zhuǎn)換器、放電系統(tǒng)、電極、油箱、電極定位架、計(jì)算機(jī)數(shù)據(jù)處理系統(tǒng)、軟件等組成;
2、計(jì)算機(jī)---A/D轉(zhuǎn)換器---測量控制系統(tǒng)---調(diào)壓裝置---升壓變壓器---試樣;
3、高壓變壓器主要產(chǎn)生試樣所需的直流電壓;
4、調(diào)壓器用于調(diào)節(jié)升壓變壓器輸入端電壓以產(chǎn)生高壓所需的輸入電壓;
5、電壓測量主要是從高壓變壓器測量端測量,高壓變壓器測量端和高壓端是線性的;
6、放電系統(tǒng)在試驗(yàn)做完以后放電,以免產(chǎn)生放電對人身的危害;(當(dāng)試驗(yàn)結(jié)束后,機(jī)器部件仍可能存在殘留的高電壓,此殘留電壓足以對人產(chǎn)生致命的傷害,配備此棒,完好的解決此安全隱患)。

 

 

 

整機(jī)組成:
1、升壓部件:由調(diào)壓器和高壓變壓器組成0~50KV的升壓部分。
2、動(dòng)部件:由步進(jìn)電機(jī)均勻調(diào)節(jié)調(diào)壓器使加給高壓變壓器的電壓變化。
3、檢測部件:由集成電路組成的測量電路。通過信號(hào)線把檢測的模擬信號(hào)和開關(guān)信號(hào)傳給計(jì)算機(jī)。
4、計(jì)算機(jī)軟件:通過智能電路把由檢測設(shè)備采集的測控信號(hào)傳給計(jì)算機(jī)。計(jì)算機(jī)根據(jù)采集的信息控制設(shè)備運(yùn)行并處理試驗(yàn)結(jié)果。
5、試驗(yàn)電極:根據(jù)國家標(biāo)準(zhǔn)(1408.1-2006)隨設(shè)備提供三個(gè)電極,具體規(guī)格為:Ф25mm×25mm兩個(gè);Ф75mm×25mm一個(gè)。

 

 

 

參數(shù)
輸入電壓: 交流 220 V  

輸出電壓: 交流 0--100 KV ;/直流 0—100 KV


電器容量: 10KVA   

高壓分級: 0-100KV  

升壓速率:0.01-5.0kv(備注:滿足標(biāo)準(zhǔn)要求并可以根據(jù)用戶需求設(shè)定不同的升壓速率)


06、試驗(yàn)方式: 交流試驗(yàn)/直流試驗(yàn):1、勻速升壓   2、梯度升壓 3、耐壓試驗(yàn)


試驗(yàn)介質(zhì):空氣,試驗(yàn)油   安裝靈敏度較高的過電流保護(hù)裝置保證試樣擊穿時(shí)在0.05S內(nèi)切斷電源。  儀器配備先進(jìn)的故障報(bào)警系統(tǒng) 避免用戶操作故障儀器發(fā)生危險(xiǎn)。(上位機(jī)報(bào)警和下位機(jī)報(bào)警)

 

 

 

軟件功能:
01、軟件平臺(tái):WINDOWS窗口操作平臺(tái),界面直觀,便于操作
02、曲線顯示:在實(shí)驗(yàn)過程中可以動(dòng)態(tài)顯示試驗(yàn)曲線
03、數(shù)據(jù)導(dǎo)出:可以對試驗(yàn)結(jié)果導(dǎo)入EXCEL表格
04、實(shí)驗(yàn)報(bào)告:可以人為設(shè)置報(bào)告名稱,并對實(shí)驗(yàn)報(bào)告進(jìn)行打印
05、試驗(yàn)方式:可以根據(jù)需求對直流試驗(yàn)和交流試驗(yàn)進(jìn)行靈活選擇
06、試驗(yàn)方法:可以根據(jù)需求自行選擇擊穿電壓、耐壓試驗(yàn)、梯度試驗(yàn)
07、參數(shù)設(shè)置:可以根據(jù)不同的試驗(yàn)方式及試驗(yàn)方法靈活設(shè)置所需的不同參數(shù)值
08、試樣設(shè)置:可對不同標(biāo)準(zhǔn)的試樣參數(shù)靈活設(shè)置
09、人員管理:設(shè)置用戶名及密碼,不同的操作員登入進(jìn)行不同的試驗(yàn),互不影響
10、標(biāo)準(zhǔn)選擇:含有不同標(biāo)準(zhǔn),可根據(jù)需求自行選擇
11、連續(xù)操作:連續(xù)操作試驗(yàn)時(shí),可直接在軟件里選擇電機(jī)復(fù)位,進(jìn)行二次試驗(yàn)

 

 

將介電試驗(yàn)機(jī)的一根試驗(yàn)引接到作為一個(gè)電極的試樣的導(dǎo)體上,并另一根試驗(yàn)引接到作為另一個(gè)電極的金屬試棒上,電壓應(yīng)從零開始上升至28.1規(guī)定的試驗(yàn)電壓。升壓速度不得超過500V/s如果達(dá)到水平無擊穿,電壓應(yīng)保持在該水平60秒。

 

 

操作臺(tái)要求

1.試驗(yàn)電流、電壓(測量線圈和電壓互感器值分別顯示)、時(shí)間的實(shí)時(shí)動(dòng)態(tài)顯示、擊穿瞬間電流、電壓、時(shí)間的保持顯示;

2.合閘、零位、上限、升壓、降壓、恒壓、急停等狀態(tài)監(jiān)控顯示;

3.操作界面有啟動(dòng)鈕、停止鈕、急停鈕、高壓指示燈;

4.有“擊穿”,“耐壓”,“梯度耐壓”選擇開關(guān);

5.具有“試驗(yàn)電壓”、“過流閥值”、“升壓速度”、“恒定耐壓時(shí)間”、“逐級初始電壓”、“逐級梯度電壓”、“逐級耐壓時(shí)間”設(shè)置功能;

6.試驗(yàn)電壓、電流曲線實(shí)時(shí)顯示。


 

 

Test method: dc/ac: breakdown test, compression test, step test
Display mode: curve/data display, data printing.
Test space: insulating oil/air
Pressure rise rate: 0.1 KV/S - 3 KV/S
High precision: 2% or less

 

 

Performance characteristics:
1, mainly by the booster system, measuring system, A/D converter, discharge system, electrode, fuel tanks, electrode positioning, computer data processing system, software, etc;
2 - A/D converter, computer measurement control system - - - - regulating device step-up transformer - sample;
3, high voltage transformer is mainly produce samples required dc voltage;
4, voltage regulator is used to adjust the step-up transformer voltage of the input to generate the input voltage to high voltage;
5, voltage measurement mainly from high voltage transformer end measurement, high voltage transformer is linear measurement end and high end;
6 finish after discharge, discharge system in the test, lest produce discharge of bodily harm; (when the experiment ended, the machine parts are still there may be residual high voltage, the residual voltage is enough to cause fatal damage to people, equipped with the rod, solve the potential safety hazard of intact).

 

 

Composition:
1, booster parts: consists of a voltage regulator and the high voltage transformer 0 ~ 50 kv booster section.
2, moving parts: uniform regulation voltage regulator by stepper motor to high voltage transformer voltage change.
3, test parts: measurement circuit composed of integrated circuit. Through the analog signal and the detection line switch signal to the computer.
4, computer software, by testing equipment acquisition through inligent circuit of measurement and control signals to the computer. Computer control equipment operation according to the collected information and process the test results.
5, test electrode: according to the national standard (1408.1-2006) with the equipment to provide three electrodes, specifications are: Ф two 25 mm x 25 mm; Ф a 75 mm x 25 mm. Except (build)

 

 

Performance characteristics:
1, mainly by the booster system, measuring system, A/D converter, discharge system, electrode, fuel tanks, electrode positioning, computer data processing system, software, etc;
2 - A/D converter, computer measurement control system - - - - regulating device step-up transformer - sample;
3, high voltage transformer is mainly produce samples required dc voltage;
4, voltage regulator is used to adjust the step-up transformer voltage of the input to generate the input voltage to high voltage;
5, voltage measurement mainly from high voltage transformer end measurement, high voltage transformer is linear measurement end and high end;
6 finish after discharge, discharge system in the test, lest produce discharge of bodily harm; (when the experiment ended, the machine parts are still there may be residual high voltage, the residual voltage is enough to cause fatal damage to people, equipped with the rod, solve the potential safety hazard of intact).

 

 

 

The whole machine:
1, booster parts: consists of a voltage regulator and the high voltage transformer 0 ~ 50 kv booster section.
2, moving parts: uniform regulation voltage regulator by stepper motor to high voltage transformer voltage change.
3, test parts: measurement circuit composed of integrated circuit. Through the analog signal and the detection line switch signal to the computer.
4, computer software, by testing equipment acquisition through inligent circuit of measurement and control signals to the computer. Computer control equipment operation according to the collected information and process the test results.
5, test electrode: according to the national standard (1408.1-2006) with the equipment to provide three electrodes, specifications are: Ф two 25 mm x 25 mm; Ф a 75 mm x 25 mm.

 

 

 


The input voltage: ac 220 V

Output voltage: communication 0-100 KV; / dc 0-100 KV


Electric capacity: 10 kva

High pressure sizing: 0-100 kv

Pressure rise rate: 0.01 to 5.0 kv (note: meet the standard requirements and can be set according to user requirements different pressure rise rate)


06, test method: ac/dc test: 1, 2, gradient booster 3 uniform booster, withstand voltage test


Test medium: air, oil test installation high sensitivity of over current protection device to ensure the sample breakdown within 0.05 S when cut off power supply. The instrument is equipped with advanced fault alarm system Avoid user operation fault instrument. Alarm (the upper machine and lower machine alarm)

 

 

 

The software functions:
01, software platform: WINDOWS operating platform, intuitive interface, easy operation
02, curve shows that: in the process of experiment can dynamically display test curve
03, data export: can the test results into EXCEL spreadsheet
04, experimental report: report the name can be set, and the experiment report printing
05, test mode, can according to demand for flexible choice of dc test and ac test
06, test method, can according to need to choose the breakdown voltage, compression test, gradient test
07, parameter setting, can according to different test method and test method for flexible set required different parameter values
08, sample setting: samples of different standard flexible parameters can be set
09, personnel management: set the user name and password, different operator login to test different each other
10, standard options: contain different standards, according to the demand to choose
11, continuous operation, continuous operation test, can choose motor directly in the software reset, for a second test

 


Drew dielectric tester of a test of the samples received as an electrode conductor, and the other test lead received as another electrode metal test bar, rose to 28.1 from scratch from voltage should be specified test voltage. Booster speed should not exceed 500 v/s if level and no breakdown, voltage should be kept in the level of 60 seconds.

 

 

Work station for

1. The test current, voltage, voltage transformer coil and value respectively display), time of real-time dynamic display, breakdown of instantaneous current, voltage, time keep display;

2. Switching, zero, ceiling, step-up, step-down, constant pressure and stop condition monitoring display;

3. The interface has a button, emergency stop button and stop button and high pressure indicator light;

4. There are "breakdown", "pressure", "gradient pressure" selector switch;

5. The test voltage, over current threshold ", "booster" speed, "constant pressure time", "initial voltage step by step", "step by step gradient voltage", "graduated compression time setting function;

6. The test voltage, current curve real-time display.

 

留言框

  • 產(chǎn)品:

  • 您的單位:

  • 您的姓名:

  • 聯(lián)系電話:

  • 常用郵箱:

  • 省份:

  • 詳細(xì)地址:

  • 補(bǔ)充說明:

  • 驗(yàn)證碼:

    請輸入計(jì)算結(jié)果(填寫阿拉伯?dāng)?shù)字),如:三加四=7
聯(lián)系人:陳丹
手機(jī):
18911395947
點(diǎn)擊這里給我發(fā)消息
 
挺进朋友人妻雪白的身体韩国电影| 欧美丰满老熟妇aaaa片| 国产农村妇女高潮大叫| 久久精品国产99国产精品导航| 777午夜福利理伦电影网| 久久久久99人妻一区二区三区| 日本大乳高潮视频在线观看| 少妇人妻偷人精品免费视频| 中文字幕一区二区三区人妻少妇| 国产极品久久久久极品| 欧洲无码一区二区三区在线观看| 四虎影视永久在线观看| 97伦伦午夜电影理伦片| 欧美性xxxx极品高清| 国色天香精品一卡2卡3卡4| 国内揄拍国内精品少妇| 青青久在线视频免费观看| 亚洲av无码一区二区三区网站| 欧美乱妇高清无乱码免费| 麻豆人人妻人人妻人人片av| 久碰人妻人妻人妻人妻人掠| 国产欧美亚洲精品第一页| 精品亚洲成a人7777在线观看| 日本顶级metart裸体全部| 精品无码国产自产拍在线观看蜜| 精品无码日韩一区二区三区不卡| 国产精品视频一区国模私拍| 99视频精品全部在线观看| 一本色道无码道dvd在线观看| 欲求不満の人妻松下纱荣子| 99久久免费精品高清特色大片| 午夜理论片yy44880影院| 国模欢欢炮交啪啪150| 人妻在卧室被老板疯狂进入| 国产真人无码作爱视频免费| 亚洲av福利院在线观看| 国产香蕉97碰碰久久人人| 天天爽夜夜爽人人爽一区二区| 久久人人爽人人爽人人片av东京热| 久久久久麻豆v国产精华液好用吗| 宅男666在线永久免费观看|